Update on House Progress


We are scrambling as quickly as we can to get at least a portion of the house livable, as our temporary housing will soon come to an end.

We've got nearly all the electrical wiring replaced, the broken windows have been replaced, most of the damaged plumbing has been fixed or capped off.

Some structural issues still remain, such as replacing the bathroom subfloor and joists, and repairing some of the burnt out walls.



Things remaining left to do are: insulation, drywall, paint, installing some flooring and the bathroom components, installing lighting throughout. On the outside of the house, I believe we are only lacking getting the damaged siding replaced. And a lot of cleanup!